I'm working in MEP 2011 and setting up a panelboard schedule. I've connected all my loads to the panel and now I want to change the demand factor of the HVAC load classification from 100% to 80%. I have gone through all the equipment and made sure the connectors are have the demand factor at 80% but on the schedule it still shows up at 100%.
I am lost at what to do from here and I don't really want to create formulas for each load since the setting should figure out the demand factor is at 80%. It is a possibility that i missed some equipment since this is a good sized project.
Anything help would be great since this is really my first time custimizing the schedules.
thanks