All of LDT Pipes calculations is based on the Inside Face of the pipe
Gustavo, not the outside.
Designers/Engineers need to make sure they add the Wall Thickness to their
calculations. That way they can be assured that their pipe crossings retain
the Reviewing Agencies allowable differential.
For example:
http://tinyurl.com/fwkby
That tinyurl will take you to my Google Search, where I used "pipe crossing
allowed vertical distance" - without quotes - as my text to enable the
results I received.
Hope that helps you with this situation.
--
Don Reichle
"The only thing worse than training your staff, and having them leave is -
not training your staff, and having them stay." 😮
A reminder taken from Graphics Solution Providers' Calendar page
--------------------------------------------------------------------
!! Please discuss whatever we tell you with your SysMgr !!
!! They appreciate staying in the loop 🙂 !!
LDT-2K4
AMD Athlon 64 3200+ 2.2GHz
XPPro 32bit SP2
1GB RAM
Nvidia GeForce FX 5200 128MB
WD 36GB Raptor
"The only Constant is Change".
"Gustavo Rojas" wrote in message
news:5346055@discussion.autodesk.com...
TOP: The outside of the pipe, the outer wall.superior end.
Thanks,
Ing. Gustavo Rojas
"Don Reichle" escribió en el mensaje
news:5344966@discussion.autodesk.com...
That would be the Top of the pipe Gustavo.
I've always wanted a "vertical" check also, rather than adjacent to the
Pipe's slope - but that's just my own perspective.
--
Don Reichle
"The only thing worse than training your staff, and having them leave is -
not training your staff, and having them stay." 😮
A reminder taken from Graphics Solution Providers' Calendar page
--------------------------------------------------------------------
!! Please discuss whatever we tell you with your SysMgr !!
!! They appreciate staying in the loop 🙂 !!
LDT-2K4
AMD Athlon 64 3200+ 2.2GHz
XPPro 32bit SP2
1GB RAM
Nvidia GeForce FX 5200 128MB
WD 36GB Raptor
"The only Constant is Change".
"Gustavo Rojas" wrote in message
news:5344853@discussion.autodesk.com...
In settings for pipes : Cover Check : Specifies the cover of soil over the
TOP OR INVERT elevation of the pipe ??.
I need help. Thanks.
Ing. Gustavo Rojas N