I am trying to determine how AE08 decides which component is the source and which component is the destination when processing the "From To" list. I have not been able to see a pattern. I have looked for a hierarchy of components, sequence of placement in the dwg, and left-right / top-bottom flow in the model space. None of these seem to be consistently followed.
Our assemblers are directed to wire from the electrical source to the electrical destination. I.e. from the breaker to the contactor, from the contactor to the overload relay, from the overload relay to the motor. We would like AE to follow this convention.
In the end I want to pull the description of the Destination component into the "From To" list as a tool for anyone doing troubleshooting.
I know I'm asking for the moon but even if I just get a little moon dust I will be quite happy