• Industries
  • Products
  • Buy
  • Services & Support
  • Communities
  • Discussion Groups

    AutoCAD Civil 3D

    Reply
    Active Contributor
    kkuecker-traffic
    Posts: 27
    Registered: ‎01-13-2012
    Accepted Solution

    Drawing X,Y shifted when attached as reference

    114 Views, 3 Replies
    11-06-2012 08:47 AM

    I have a drawing when attached into another drawing, the coordinates have an exact 500,000 shift in the X value and an exact 200,000 shift in the Y value.  Directely in the drawing, the coords are correct.  They just won't attach correctly.

     

    What could cause this?

     

    I can tell that this drawing was not created with the dwt we use (it is missing certain styles) - I wonder if the dwt could be to blame.

     

    Also, I have been trying to figure the Map functions out with no guidance, I wonder if I somehow changed the attach settings to cause the shift.

     

    -Katy

    AutoCAD Civil 3D 2012

    Windows 7

    64 bit

    Intel Core i5-2500K CPU @ 3.30 GHz
    8.00 GB
    64-bit
    Please use plain text.
    *Expert Elite*
    Posts: 1,841
    Registered: ‎12-18-2002

    Re: Drawing X,Y shifted when attached as reference

    11-06-2012 08:58 AM in reply to: kkuecker-traffic

    A possibly cause:

     

    Open the Xref drawing and type INSBASE. That is the point that gets placed at the insertion point you specify when you xref this into the other drawing.

     

    So, if insbase in this drawing is 5000, 2000 and in the other drawing you xref this in and specify 0,0 as the insertion point, 5000,2000 get put at 0,0.

     

    Easy to rectify. Just set insbase to 0,0 in the xref drawing.

    Tim Corey, Owner
    Delta Engineering Systems
    Redding, CA
    Autodesk Authorized Value-Added Reseller
    Please use plain text.
    *Expert Elite*
    TRogers
    Posts: 664
    Registered: ‎09-05-2007

    Re: Drawing X,Y shifted when attached as reference

    11-06-2012 09:07 AM in reply to: kkuecker-traffic

    More than likely you are too far away from the origin point.  Do your coordinates at the bottom left of your screen happen to have a "+" symbol in them?

    If the issue was resolved by this method, please click on "Accept As Solution"
    *Civil 3DJ*
    Todd Rogers

    Visit my blog here.

         
    Please use plain text.
    Active Contributor
    kkuecker-traffic
    Posts: 27
    Registered: ‎01-13-2012

    Re: Drawing X,Y shifted when attached as reference

    11-06-2012 09:35 AM in reply to: kkuecker-traffic

    The INSBASE command did the trick.

     

    I went to the creator of the drawing and they used the WBLOCK command to get the drawing and made the 500,000 , 200,000 as the insertion point of the drawing without realizing it.

     

    We just chaged the drawing to be 0,0,0 and it seems to be working just fine now!

     

    Thanks!!

     

    -Katy

    Intel Core i5-2500K CPU @ 3.30 GHz
    8.00 GB
    64-bit
    Please use plain text.