Old post but I am in the same boat 5 years later. I have about 20 data shortcuts for roadway alignments and probably 40 or so for underground utilities. I frequently update the alignments and when the big baloon notification pops up in the lower right hand corner of my screen, I close it because I don't want to sit and wait for all the pipe networks to update when they do not need to. I just want to update the alignment data shortcuts. Problem is, I can only click one at a time so I have to click 20 times to update the alignments.
Is there a way to only update all alignment data shortcuts?
Yeah that is what I finally ended up doing. Although, a simple button to click on and synchronize data shortcuts that you highlight in a list would really, really be nice.
I know, I have a beef with this too.
For example, I have a few alignments in one drawing, some in another. I have a pipe network in one drawing and a different pipe network in another. I have a few surfaces in another drawing. Let's say all these are d-reffed into my current drawing.
Now lets say I edit one of my alignments in its drawing, and save the drawing. I switch back to my current drawing and the bubble pops up. Why on earth does it synchronize all those d-reffs from all those different drawings? The pipe network & surface drawings weren't even touched, but they will all get sync'd. Bizarre, and time wasting!
Mark Green
Working on Civil 3D in Canada