Add a second Material thickness layer to each slope limit range on the Daylight subassemblies for correct earthwork calcs, and demonstration to the contractor in section view for correct construction. Riprap for example is to be placed on a layer of granular bedding.
Fred Ernst, PE
C3D 2024
Ernst Engineering
www.ernstengineering.com