Hi
I have a question about stormsewer(pipe network) design.
I have a spreadsheet for design of main pipelines,it means i have invert elevation of pipes and rim elev of manholes.
1-i want to have catchbasins with 1% slope (as fixed) for first
2-how can I use swap for multiple structures
3-please correct me for design procedure at civil3d+SSA:
- drafting network at civil3d and getting rim elev from a surface
- export to SSA
-at SSA assign flows to pipes an then design pipes
-import to civil3d
so my question is what is the puspose of "rule" command in this situation.
4-Rule command when can help me,because I think this command don't care to flow at all
Thanks
Hamid