I just felt there is something wrong with this picture (see attachement), so I wanted to share. It looks to me as some sort of bug... In the prospector I have defined two sites (Maplewood Phase 6 and Site), when I want to create an alignment and select the site, it lists the two sites from the prospector, and duplicated versions of site called Site. (have SP1 installed). Any ideas, comments? Thanks,
Strah
Message was edited by: strah