Using the subassembly composer.
I have created a switch for 4 different curb style geomtries. Switch works great.
After the switch, I want to bring the branches back together.
I want the next point to be common. Trouble is, I have 4 possible origins.
How do I validate the origin for this next point?
C3D 2012