C3D 2008 Sp2 on WinXp Pro:
Is the following procedure possible?
I need to have multiple profile views that display pipe information in one
production sheet.
I created the new sheet with a PS viewport and Xref'd the base plan, with
original profiles, into MS. I have already created the xml data shortcuts
for the pipe networks. Do I need to create the data shortcuts for the
alignments that represent the pipe runs aswell? Or just for the profiles,
or ALL of it? I want to annotate the pipes in the profile views in the
production sheet. I have a feeling that I am going to have to create
shortcuts to the profiles and create new profile views in the production
sheet, then I can display the pipes in the new views, and annotate them.
Does this sound about right?
Thanks,
Tired and Frustrated