Hi guys,
Please see the attached corridor i prepared for the channel. The bottom of channel is approx. 3' below the EG. Now i would like to daylight (transition) the existing section to the EG downstream at certain slope (say 5%). The way i did was - created a feature line (trace) along the channel end (including daylight) and grade that feature line to the EG at required slope. But it seems not right.
Am I in the ri8 direction?
Thanks