We recently upgraded from ADT 2006 to ACA 2014. This issue has only shown up in ACA. We create constructs and place the spaces and doors in the constructs. We then create schedules in their own view and reference back to the construct. Everything is correct in the view. When we xref the scheules into a sheet they show up correct. We then save the file and close it. Next time we open the sheet, the schedule shows space not found for all of the doors. I feel pretty proficient with the program but this one has me stumped. Anyone have any idea what could be causing this?
Are you placing the Door Schedule in a View file and then scheduling the Construct as an external drawing? Or are you creating a Construct that applies to one or more floors, and then adding a Door Schedule that schedules the doors in the external references in the View file?
I created an admittedly small sample project in ACA 2014 and created a Door Schedule using both of those methods (with out-of-the-box templates and content), and I cannot reproduce your issue. Was your project created in ACA 2014, or did you start it in ADT 2006? If the latter, have all files been opened and saved in 2014?
Hi,
You have created several floors in one construction?
Table should refer to View.
You can collect a few floors in the "Master file" on the Views tab
In the "Master file", create Schedule tables to one or more floors, create model view,
drag it on sheets
Vitaly
Hi dtobin,
To cover a couple of bases, do the following suggestions force the schedule the update correctly for you?
I'd also like to know:
I tried a few of these but nothing worked. It appears that there is some bug between what was created in ADT 2006 and trying to use it in ACA 2014. I have had other issues with office created content from 2006 not working properly in 2014. For instance I had to re-create our standard room tag and re-import the wall section markers and the elevation markers into our custom tool catalog in Content Browser.
For the schedule, it was quicker to just re-create it in ACA 2014. The door schedule is defined in my AEC_Model template file. I created a new view and inserted the out of the box schedule. The out of the box schedule and my door schedule have the same name so when I insert the out of the box schedule it automaticlly matches the settings in my template file, so everything is correct. I then saved that to my custom tool catalog. I have used it since then and it appears to be working just fine now.
Thank you everyone for your input and help.